Plan your next licensing step
How apprentice, journeyman, and master licenses differ, and how open-book NEC exams actually work.
Continue in the app →Use electrical formulas with confidence
Ohm’s law, series vs parallel, AC power, and the handful of formulas licensing exams actually use.
Continue in the app →Recognize electrical hazards
Lockout/tagout, shock and arc-flash awareness, qualified persons, and why GFCI/AFCI exist.
Continue in the app →Recognize tools and materials
Conductor and raceway types, boxes, identification, and the quality checks that happen before you energize.
Continue in the app →Find the NEC rule you need
How chapters, articles, exceptions, and tables fit together so you can find the rule under time pressure.
Continue in the app →Know what NEC terms mean
Grounded vs grounding, branch vs feeder vs service, continuous load, and the terms that decide other articles.
Continue in the app →Check installation requirements
Working space, dedicated equipment space, interrupting ratings, identification, and listed equipment.
Continue in the app →Apply branch circuit rules
Ratings, GFCI/AFCI locations, receptacle spacing, multiwire circuits, and kitchen/laundry dedicated circuits.
Continue in the app →Distinguish services from feeders
Service point, service disconnect, feeder vs branch boundaries, and grounding connections at the service.
Continue in the app →Match protection to the circuit
Overload vs short circuit, standard breaker sizes, conductor protection, and the tap rules people skip.
Continue in the app →Understand grounding and bonding
Fault paths, EGC vs GEC, electrode systems, and why subpanels do not get a second neutral-ground bond.
Continue in the app →Work out conductor ampacity
How to use Table 310.16, apply adjustment and correction, and land on a number that 110.14(C) will accept.
Continue in the app →Solve raceway and box-fill questions
Raceway fill, box-fill volume, support, wet and underground installations, and how to work a 314.16 problem.
Continue in the app →Work through load calculations
Standard vs optional dwelling methods, demand factors, HVAC and range loads, and the 125% motor adder.
Continue in the app →Practice calculations before exam day
Voltage drop, fill, box fill, motor FLC, transformer current, and how to not run out of time.
Continue in the app →Solve motor circuit questions
FLC tables, 125% conductors, 430.52 OCPD, overloads, disconnects, and why nameplate is not always the table.
Continue in the app →Calculate transformer current
Primary/secondary protection, kVA-to-current, separately derived grounding, and transformer tap logic.
Continue in the app →Find rules for special locations
Class/Division vs Zone, fuel dispensing, pools, health care, temporary power, and how Chapter 5 modifies Chapters 1–4.
Continue in the app →Find rules for special equipment
Signs, elevators, EVSE, PV, energy storage, fire pumps, and how to navigate the 600s.
Continue in the app →Identify low-voltage circuit rules
Class 2/3, fire-alarm circuits, separation from power, PoE, and why Chapter 8 stands apart.
Continue in the app →Read plans and lighting questions
Luminaire listings, switching, space heating, panel schedules, and how exam plan-reading questions are built.
Continue in the app →Plan your next electrical credential
How master exams differ, supervision, permitting, code cycles, ethics, and the exam-day checklist.
Continue in the app →NEC
National Electrical Code (NFPA 70). The adopted edition and local amendments control the installation rules in your jurisdiction.
AHJ
Authority Having Jurisdiction. The local body that enforces adopted codes and issues permits.
GFCI
Ground-fault circuit interrupter. Opens a circuit when current to ground exceeds a defined threshold.
AFCI
Arc-fault circuit interrupter. Detects hazardous arcing conditions on branch circuits where required.
OCPD
Overcurrent protective device. Fuses or breakers sized per NEC Article 240 and manufacturer listings.
EGC
Equipment grounding conductor. Provides a low-impedance path for fault current. It is distinct from the grounded conductor.
Grounded conductor
Intentionally grounded circuit conductor, often identified white or gray. Carries normal current on some circuits.
Bonding
Connecting metal parts to establish electrical continuity and fault-current path. Distinct from grounding electrodes.
Service
Conductors and equipment delivering utility power to the premises wiring system.
Feeder
Circuit conductors between the service equipment and the final overcurrent device ahead of branch circuits.
Branch circuit
Conductors between the final OCPD and outlet(s).
Ampacity
Maximum current a conductor can carry continuously under defined conditions without exceeding temperature rating.
Demand factor
A multiplier applied to connected load to estimate actual simultaneous usage.
Continuous load
A load expected to operate for three hours or more. Affects conductor and OCPD sizing.
Working space
Clear area around electrical equipment required by NEC 110.26 for safe access and maintenance.
Lockout/tagout
Procedures that isolate energy sources before work. OSHA 29 CFR 1910.147 and 1926 Subpart K apply on many jobs.
Arc flash
Explosive release of energy from an arcing fault. NFPA 70E defines approach boundaries and PPE categories.
Conduit fill
Limit on the number and size of conductors inside a raceway per NEC Chapter 9 tables.
Box fill
Calculation of conductor volume, devices, and clamps inside outlet boxes per NEC 314.16.
Voltage drop
Loss along a conductor run. Excessive drop can affect equipment performance and may fail exam or AHJ review.
Motor FLA
Full-load amperes from the motor nameplate or NEC tables. Use this value when sizing branch circuits and conductors.
Disconnect
Means to open all ungrounded conductors to a motor or other utilization equipment.
Neutral
Grounded conductor in a system. On a single-phase 120/240 V service, the center tap of the utility transformer.
Receptacle
Contact device for attachment of a plug. GFCI and AFCI requirements vary by location and NEC edition.
Panelboard
Assembly of overcurrent devices and buses in an enclosure. Working clearance and labeling matter for inspection.
Service disconnect
Main means to shut off all ungrounded service conductors at or near the service entrance.
Separately derived system
A premises wiring system with no direct connection to a utility supply. A transformer is a common example.
Special occupancy
Locations covered by extra NEC rules, including wet, hazardous, and health care spaces in Chapters 5–7.
Limited energy
Systems such as fire alarm, communications, and Class 2 circuits under NEC Chapter 7 and 8.
Listing
Equipment evaluated by a recognized testing laboratory for a specific use. Unlisted substitutions can fail inspection.
Torque
Proper terminal tightening per manufacturer instructions. Under-torqued connections are a common failure point.
Knockout
Removed section of a box or enclosure for raceway entry. Must be properly closed if unused.
Continuity
Unbroken electrical path verified with a tester before energizing or after repair.
Put what you learn into practice.
Use short question sets and explanations to check your understanding. Choose your exam state in the app and keep your reference notes available offline.